Bogosa Gold Mine - Ghana

Tektower was awarded the contract to supply all the water cooling equipment for the Bogoso Biox Phase III Project at Bogoso in Ghana. Scope of Work::

Biox 1 and 2

Supply, erect and install

  • 8 x 2 cell EWB3600 Cooling Towers
  • 12 x Plate Heat exchangers
  • 2 Side Stream Filters
  • 2 Dosing Systems
  • 12 Open Circuit Pumps
  • All Open Circuit Piping

Blower System

Supply, erect and install

  • 1x 3cell EWB2875 Cooling Tower
  • 2 x Plate Heat Exchangers
  • 1 Side Stream Filter
  • 1 Dosing System
  • 3 Open Circuit Pumps
  • All Open Circuit Piping

Design Parameters

 

Biox Module 1 & 2

Blower + 50% Standby

 

Total Heat Load

44 032

9510

kW

Design Inlet Temp

39.3

46.0

ºC

Design Outlet temp.

34.5

36.0

ºC

Water Flow Rate

8 000

816

M3/hr

Design Wet Bulb

31.0

31.0

ºC

Design Dry Bulb

33.0

34.0

ºC